Congo DRC – 2000 tons
In 2009 with the advent of the building of the Tenke Fungurume Mine in the Congo DRC, it was decided to expand further. Vital Steel was contracted to Freeport MacMorran, an American Mining House to do Structural Steel and Sheeting for Sub Stations and erection of more than 2000 tons of steel.

Tanzania Kilombero Bridge – 300 tons
Vital Steel completed Steelwork as a Sub Contractor to Murray & Roberts Construction at the Kilombero Sugar Mill spanning 200 meters over the Great Rua River . The Structure was built by a dewatering process that enabled Welding of columns and Structures to be done .
Mozambique – Mozal Smelter – 1500 tons
The construction of the Smelter required Offices, Canteens and Walkways at the Smelter.